Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
East Port Water Reclamation Facility Expansion
Last Updated: 03/14/2025 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Englewood East MSBU Bridge Rehabilitations - Construction
Last Updated: 03/14/2025 Category: Bridges Current Phase: Complete
Englewood East MSBU Bridge Rehabilitation - Bridges #014083, #014084, #014091, #014096, #014097Greater Port Charlotte MSBU Bridge Rehabilitations - Design
Last Updated: 03/14/2025 Category: Bridges Current Phase: Design Development
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Gulf Cove Interior Canal design and maintenance dredge project
Last Updated: 03/14/2025 Category: Coastal Current Phase: Design Development
Gulf Cove Interior Canal bathymetric survey and design project to 4' MLW Gulf Cove Waterway MSBU.Last Updated: 03/14/2025 Category: Parks And Recreation Current Phase: Construction
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Lakeview/Midway Wastewater Expansion
Last Updated: 03/14/2025 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Midway Boulevard Bridge over North Spring Lake - Bridge #014073 Construction
Last Updated: 03/14/2025 Category: Bridges Current Phase: Construction
Midway Boulevard Bridge over North Spring Lake - Bridge #014073Last Updated: 03/14/2025 Category: Parks And Recreation Current Phase: Design Development
Creation of a master plan through the park design process and phase 1 development.Northwest Port Charlotte MSBU Bridge Rehabilitations - Design
Last Updated: 03/14/2025 Category: Bridges Current Phase: Design Development
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045